Posted on February 3, 2023February 3, 2023

Last week we got the kitchen ceiling painted up and got the electrical more or less finished up. This week, we focused our efforts on the kitchen floors. For the flooring we’re using the same tongue and groove pine that we used in the living room and dining room. When we installed those floors, we stopped right at the opening between the kitchen and the dining room. So this week we picked up where we left off with those floors.

Teak was just a puppy when we installed the floors last time

The old floor was bad!

One of the reasons we had stopped the installation of the flooring at the kitchen is because the original kitchen floor was bad. Real bad. As I started getting into it, it became a full tear out and redo of the entire floor system including the framing. Well, now with brand new framing and subfloors, we were ready to proceed.

Rebuilding the old, rotted, kitchen floor frame

Setting up

My mom gave the floors a good vacuum while Teak supervised.

Teak is dirty!

My dad got set up in the driveway to cut the major defects out of the boards. The tongue and groove boards come in lengths up to 10′ or so, and they’re chock full of knots and defects. So the first step is cutting out all of the bad stuff so that we have usable planks. Once we have the usable planks, we start laying them out on the floor and installing them.

Cutting the defects out

Teamwork

Oceana and my mom helped hand off boards being cut and getting the next boards staged for me. I was the installer. It was a full team effort.

  • Oceana staged the boards and marked them to be cut
  • Mom kept the work area clean
  • Cutting planks to length

Slowly but surely we worked our way towards the makeshift sink and countertop. Once we got too close to the sink, it was time to remove it. I had held off initially in case we ran into any issues with the floor as I didn’t want to uninstall it just to have to put it back without getting the floor in.

Finishing up

With the sink, dishwasher, and water purification system out of the way, we finished installing the flooring all the way to the wall.

Finishing up the last few rows of the kitchen floor

With the new floors in it was time to put the sink, dishwasher, and water purification system right back in. Done.

Reinstalling the makeshift sink

Installing the A/C

Last on the list was getting the air conditioner/heater unit re-installed in the kitchen ceiling. We removed this unit nearly a year ago when we redid the kitchen ceiling. Two weeks ago we installed the cypress ceiling and last week we got the new ceiling painted, so it was time for it to get reinstalled. Also, I wanted to make sure the floor had a chance to acclimate before we sanded and this unit would help with that. So up a ladder I went and a while later the unit was operational again.

A/C in, makeshift sink back, life is good

Next week

We’re going to let the floors set in place for a week with the a/c on (yes northerners, it’s 85 here) so that they have a chance to move as they get acclimated to the new environment. Next week we’ll plan to sand them flush and fill any gaps and cracks.

That’s all, folks!

Thanks for following along!

7 thoughts on “The Kitchen Floor”

  1. Uncle CHUCK says:
    February 3, 2023 at 9:30 am

    Keep up the good work!! It’s in the teens here and windchills below zero. Enjoy that 85 degrees.

    Reply
  2. Becky Pappas says:
    February 3, 2023 at 1:04 pm

    Looking good…..glad we got to see your house now I can visualize what your doing. It was great to visit with you all last week. Mike made the comment to me about how smart Jake was….enjoyed seeing what it is you actually do and also the salon Oceana works at. I think the best part was seeing Teak…hahaha!!!!

    Reply
    1. Jake says:
      February 11, 2023 at 7:58 am

      We’re glad you guys came to visit. We enjoyed being able to show you guys around our little world! Teak enjoyed your visit also

      Reply
  3. Becky Pappas says:
    February 3, 2023 at 1:06 pm

    Oh I forgot……our weather here in Pennsylvania SUCKS……I miss Florida already!!!!

    Reply
    1. Jake says:
      February 11, 2023 at 7:57 am

      Haha. Welcome home to PA!

      Reply
  4. Grandma says:
    February 9, 2023 at 8:40 pm

    Looking good to much work I remember when I did all that I hàted sanding when you have the time I need a new kitchen floor

    Reply
    1. Jake says:
      February 11, 2023 at 7:56 am

      Thanks Grandma! Yes, it is a lot of work. But that’s ok. What kind of kitchen floor do you want?

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our updates

Loading

Recent Blog Posts

  • Kitchen Cabinet Progress July 21, 2023
  • Happy Fourth of July! July 4, 2023
  • The Garden Fence – Part 2 April 15, 2023
  • The Garden Fence April 7, 2023
  • The Kitchen Floor Finish February 11, 2023
  • The Kitchen Floor February 3, 2023

Jake and Oceana

Contact Me

Questions or comments?  Feel free to send me a note at jake@6lakebyrd.com

©2025 6 Lake Byrd Blvd | WordPress Theme by Superbthemes.com