Last week the Corian shower got off to a good start with the floor and back wall getting installed. This week, I continued on with the install. Instead of measuring…
Blog

Corian Shower
Last week we got the back bathroom drywalled and the shower plywood installed. After fiberglassing the shower plywood, it was ready for the corian installation. The fiberglassing of the plywood…

Back bathroom drywall
Last post, I was just starting to get the drywall hung in the back bathroom. This week I was able to finish up hanging the rest of the drywall in…

R&R and new tools
Last blog post I mentioned that we got A/C in the house. I can’t even begin to say how nice that is. It doesn’t get old walking into a cool,…

We’ve got A/C!!!
It is so incredibly exciting…….we’ve got A/C! It’s up and running and it is cold. No more 95° days with 80% humidity in the house, which happened regularly this summer…

Siding and Concrete
Continuing on with the siding work on the back of the house – we were able to get it buttoned up this week. After work, I ran the siding to…

The back siding
Last week we had taken delivery of our new front and back doors. We got the new doors installed, which for the back door, included tearing off a bit of…

Back bathroom remodel
Last post, we had gutted the back bathroom down to the studs. After gutting the bathroom, I had tied in the main drain line to the septic tank. Before continuing…

Back Bathroom Remodel
This week we got a break in the weather long enough for me to get up on the roof again and finish up the last little bit of siding work…